Willard Munger State Trail - Grand Ave Bridge in Duluth
Rehabilitation of State Trail Bridge over Grand Avenue / TH 23 in the City of Duluth.
The rehabilitation of the former railroad bridge over Grand Ave/TH23 in Duluth was completed during September 2011.
Rehabilitation of the former railroad bridge which currently carries the WIllard Munger State Trail over Grand Avenue/T.H.23 in the City of Duluth. This steel beam and concrete structure which exceeds 50 years in age has been inspected and has been recommended for rehabilitation.
The structural rehabilitation of the 254 foot long four span steel beam structure to safely accomodate continued recreational use. The proposed rehabilitation of the Munger State Trail/Grand Ave. Bridge is to consist of the complete replacement of the existing wood bridge deck and trail surface and the installation of improved bridge safety railing. Accessibbility issues associated with the intersection with the Alex La Veau Trail will also be addressed. The rehabilitation of this structure was completed during September 2011.